Kitchen & Bath

Cost to Replace Kitchen Countertops

It costs $2,000 to $6,000 to replace kitchen countertops for an average kitchen with 30 to 50 square feet of surface. Installed prices run $40 to $200 per square foot depending on the material.

Quartz and granite, the most popular choices, land at $50 to $120 per square foot installed, so a typical kitchen is $2,500 to $5,000. Laminate is far less; high-end natural stone is far more.

What It Costs to Replace Kitchen Countertops

For an average kitchen, budget $2,000 to $3,000 for laminate, $2,500 to $5,000 for standard-color quartz or granite, and $6,000 or more for premium stone or a large island.

The number scales with the surface area, the material grade, and the fabrication details more than with the size of the kitchen itself.

The table below shows cost by material. Read the fabrication and edge sections, because those line items surprise people more than the slab price does.

Cost by Countertop Material

Laminate is $15 to $40 per square foot installed. It is the budget choice, improved a lot in looks, but it chips and scorches and cannot be repaired.

Butcher block is $40 to $100, warm and DIY-friendly, but needs oiling and is not ideal next to a sink. Quartz is $50 to $120, engineered, nonporous, and the low-maintenance favorite.

Granite is $50 to $120, natural and heat-resistant, and needs periodic sealing. The EPA notes that trace radon from granite is almost always negligible. Marble is $60 to $150 and stains easily. Porcelain slab, concrete, and soapstone run $60 to $200.

Where the Money Goes

The slab or sheet material is 40 to 60 percent of the job. Fabrication, the cutting, edging, and cutouts done at the shop, is 20 to 35 percent.

Templating and installation is the rest, plus removal and disposal of the old tops at $100 to $300.

Plumbing disconnect and reconnect for the sink and any small backsplash tile are usually separate. See our Kitchen and Bath cost guides for related work.

Fabrication, Edges, and Cutouts

Every cutout costs: a sink is $100 to $300, a cooktop $100 to $250, and each faucet or soap-dispenser hole $10 to $50.

Edge profiles are priced per linear foot. A standard eased or beveled edge is included; an ogee, bullnose, or mitered thick edge adds $10 to $40 per foot.

Seams are unavoidable on a large kitchen. A good fabricator places them where they are least visible and colors the epoxy to match, but there will be a seam.

What Drives the Price Up

Slab material grade is the biggest swing. Within granite or quartz, a common color is half the price of a rare one with heavy movement.

A large island from a single slab, a waterfall edge that runs the stone down the sides, and full-height stone backsplashes all add material and fabrication.

An out-of-level cabinet run, a farmhouse sink that needs custom support, or old tops glued down hard enough to damage the cabinets on removal all add labor.

Measuring the Real Square Footage

Fabricators measure the actual counter area plus overhangs, and most charge a minimum of 25 to 30 square feet even on a small kitchen.

A standard counter is 25 inches deep with a 1.5-inch overhang. An island with seating adds a 10 to 12-inch overhang that often needs steel or corbel support, priced separately.

Get the shop's own template measurement before you finalize the budget. A rough tape estimate is usually 10 to 20 percent low once overhangs and waste are counted.

Removing the Old Countertops

Laminate tops pop off fairly easily and are cheap to haul. Tile counters set in mortar are slow, messy, and can add $200 to $600 to demolition.

Old stone is heavy and sometimes glued so well it lifts the cabinet face frame. A careful crew scores the caulk and works it loose; a rushed one cracks a cabinet.

If you are keeping the cabinets, tell the installer, and confirm they will protect them during removal.

DIY vs. Professional Fabrication

Laminate and butcher block are realistic DIY projects with standard tools and a weekend. A tile counter is doable but slow.

Stone and quartz are not DIY. They need shop equipment, wet saws, and two or three people to move a slab without cracking it. Even measuring wrong wastes a slab worth thousands.

A reasonable hybrid is doing your own demo and sink disconnect, then hiring the fabricator for template through install.

Timeline

From template to installed is typically 1 to 3 weeks for stone and quartz, because the slab is fabricated at the shop after the template.

Plan for the kitchen sink to be out of service for a day or two around install: the day the old tops come off, and the day the new tops go on before the plumber reconnects.

Order any tile backsplash to start after the counters are in, so it sits on top of the new surface cleanly.

Backsplash and Sink Decisions

An undermount sink, common with stone, is set from below and the stone is polished around the opening at the shop. A drop-in sink is cheaper and fine with laminate.

A 4-inch stone backsplash cut from the same slab is a low-cost matching option. A full tile backsplash is a separate project, usually $10 to $30 per square foot installed.

Decide the sink and faucet before templating, because the fabricator cuts the holes to those exact models.

Regional and Kitchen-Size Differences

Fabrication and install labor scales with the local rate, so the same slab can cost several hundred dollars more to fabricate in a coastal metro than in a rural shop.

A small galley kitchen does not cost proportionally less, because of the square-foot minimum and the fixed cost of the template and delivery trips.

A large kitchen with a big island can cost more per square foot, not less, if the island needs a single oversized slab or a mitered waterfall edge that uses extra material.

Caring for New Countertops

Quartz needs only soap and water. Avoid abrasive pads and strong solvents, and use a trivet under hot pans, since resin can scorch even though the stone will not.

Granite and marble need sealing on install and roughly once a year after. A simple test: drip water on the surface, and if it soaks in and darkens within a few minutes, it is time to reseal.

Wipe spills of wine, citrus, and oil quickly on any natural stone. Marble in particular etches from anything acidic, leaving a dull spot that a pro has to hone out.

How to Keep the Cost Down

First, choose a standard-color quartz or granite from the fabricator's stocked slabs rather than a special order.

Second, keep the edge profile simple and skip the waterfall island. Third, do your own demo and haul-away. Fourth, use a 4-inch stone backsplash instead of full tile, at least at first.

Fifth, get three quotes on the same slab and the same square footage so you are comparing fabrication and install, not just material.

Bottom Line

Budget $2,500 to $5,000 to replace kitchen countertops with quartz or granite in an average kitchen, $2,000 to $3,000 for laminate, and $6,000 or more for premium stone, a large island, or a waterfall edge.

Get the shop's template measurement, keep the edge and layout simple, and pick a stocked color. Decide the sink and faucet first. For the rest of the kitchen and bath, see our vanity, shower tile, and bathroom remodel guides.

Kitchen Countertop Cost by Material (Installed, per Sq Ft) — Whole-dollar ranges; a typical kitchen has 30 to 50 square feet.
Item Low High Unit
Laminate $15 $40 per sq ft
Butcher block $40 $100 per sq ft
Quartz (engineered) $50 $120 per sq ft
Granite $50 $120 per sq ft
Marble or porcelain slab $60 $200 per sq ft
Countertop Replacement Cost Breakdown — Typical 40 sq ft quartz kitchen.
Item Low High Unit
Slab material $1,200 $3,200 total
Fabrication (cuts, edges, cutouts) $600 $1,600 total
Template and installation $400 $1,000 total
Old countertop removal $100 $300 total
Sink and faucet reconnect $150 $400 total

Frequently asked questions

How much does it cost to replace kitchen countertops?
About $2,000 to $6,000 for an average kitchen. Quartz or granite in a standard color is $2,500 to $5,000. Laminate is $2,000 to $3,000. Premium stone, a large island, or a waterfall edge pushes past $6,000.
Is quartz or granite cheaper?
They overlap closely, both around $50 to $120 per square foot installed. Standard-color quartz and standard-color granite land in a similar range. Rare colors and heavy veining raise either one.
Do fabricators charge a minimum square footage?
Most do, usually 25 to 30 square feet, even if your kitchen has less. That is why a very small kitchen does not cost proportionally less than a medium one.
Can I install stone countertops myself?
No. Stone and quartz slabs need shop fabrication, wet saws, and a crew to move them without cracking. A wrong measurement wastes a slab worth thousands. Laminate and butcher block are DIY-friendly.
How long does a countertop replacement take?
One to three weeks from template to install for stone and quartz, since the slab is cut at the shop afterward. The sink is out of service for a day or two around the install day.